City of Upland, CA​
Completion Date: 2008

The Basin Project is located in the City of Upland at the corner of Monte Vista Avenue and Arrow Highway north of the Interstate 10 Freeway. Prior to project design, TKE prepared a parcel map to divide the parcel and reconstruct parcel lines to accommodate the basin construction. The 40-acre basin provided 1,050 acre-feet of storage and was constructed in two phases expanding an existing flood control basin. Utilizing State grant and local funding, the project provides for 100-year flood protection and 200 acre-feet of water recharge storage. TKE subcontracted aerial target layouts and mapping services by Aero Tech Surveys. Construction staking and quantity surveys were used to verify earthwork volumes for final as-built verification, and to ensure the basin was constructed per the design specifications.​

Project Services
• Pre-project planning
• Aerial target layout and mapping​
• Parcel map preparation
• State grant application submission and coordination
• Construction management services
• Construction staking
• Quantity surveying for volume verification
• As-built verification

 

Basin Survey