City of Fontana, California
Completion Date: 2008
Project Cost: $11 Million     
The project consisted of approximately 19,500 linear feet of 48-inch and smaller vitrified clay and reinforced concrete sewer pipe, including bore and jacked pipe and casings, two siphons and numerous gates for flow diversion. The trunk sewer was constructed on San Bernardino Avenue between Cypress Avenue and Mulberry Avenue. The facility was constructed to convey 25 million gallons of wastewater per day to a proposed lift station, which will convey the water to Inland Empire Utility Agency’s Regional Plant Number 4. This project was recognized by the Riverside and San Bernardino County Branches of the American Society of Civil Engineers as Public Improvement Project of the Year in 2009.

Project Services:
• Conventional surveying
• Project management
• Construction management
• Construction staking
• Inspection
• Funding administration
• Inter-agency coordination
• As-built verification

Trunk Sewer